· HO CHI MINH CITY, VN
TTQ Co. Ltd.Cashew Processing Machines
Guide · Factory setup

Setting Up a Modern Cashew Processing Factory

What it takes to build a modern cashew factory

A practical guide to setting up a modern cashew processing factory — capacity planning, machinery, building, power, labour and financing — from a manufacturer who builds them.

Capacityplanning
Utilities& layout
Financingready
Setting Up a Modern Cashew Processing Factory
FIG.P4 // FACTORY SETUP Ø PLAN → PRODUCTION
PLC-controlled · TTQ built
In short

Setting up a modern cashew processing factory involves choosing a target capacity, securing raw-nut supply, planning the building and utilities (power, water, shell-fired heat, compressed air), selecting the machine line and automation level, and financing the project — usually with a bankable project report. A modern factory is PLC-automated for high whole-kernel yield and low labour, and uses its own shell waste for energy. TTQ supports the whole journey: layout, machinery, installation, training and a detailed project report for financing.

Scope

What's included

Capacity & supply

Match plant size to your raw-nut supply and target market.

Building & utilities

Floor layout, power, water, shell-fired heat and compressed air.

Machine line & automation

The right stages and automation level for your economics.

Financing & project report

A bankable report with capex, layout, yields and ROI.

The process

How it comes together

01

Plan capacity

Set target T/day against raw-nut supply and market.

02

Site & building

Secure the floor area, power and water.

03

Project report

Prepare a bankable report for financing.

04

Machinery & layout

Select the line and automation level.

05

Install & commission

Build, wire and commission to spec.

06

Train & run

Train operators and ramp to full production.

Why TTQ

One manufacturer, end to end

Energy-smart

Shell-fired heat and biomass boilers cut fuel cost from day one.

Built for yield

Modern grading, cutting and dry-peeling protect premium grades.

Scalable

Start at a workable scale and expand in modules.

Supplier-supported

TTQ engineers the layout and commissions the line with you.

Answers

Setting Up a Modern Cashew Processing Factory — FAQ

What do I need to set up a cashew factory?
A target capacity and raw-nut supply, a building with power and water, the machine line and automation level, energy (shell burner or boiler) and compressed air, labour, and financing — usually backed by a project report.
How much space and power does it need?
It depends on capacity; we provide a floor layout and utility requirements sized to your plant as part of the design.
Can TTQ help with financing documents?
Yes — a bankable detailed project report with capex, layout, yields and ROI is available for financing.

Talk to TTQ about Setting Up a Modern Cashew Processing Factory

Tell us your target capacity, grades and location — we’ll come back with a costed proposal.

Request a quote Contact TTQ
WhatsApp